FR-60*60-01 hydraulic automatic pipe thread rollin

FR-60*60-01 hydraulic automatic pipe thread rollin

original price: 1,00 USD
China
Production capacity:
100 Piece
Shelly Chou
Contact person

Basic Information

FR-60*60-01 hydraulic automatic pipe thread rolling machine,metal roll forming machine Technical parameter FR-60*60 hydraulic rolling machine Diameter range of thread rolled 18-60MM Rang of Pitchrolled 1.0-4.0P The maximum lengthof rolled screws Roll fixed 55MM, Roll through(infinite length) dual-use speeds of dies 220/360/560/750rpm Max.diameterof dies 118(130mm) Bore of cylindrical dies 40(35)keyay 12*4.8 width of cylindrical dies 25mm 50mm The distance between wheel axle 190-105mm output(pcs/min) 4-25pcs/min swivelling angleof roller axial ±3° Main Motor 5HP 6P(3.7kw,4kw) Hydraulic motor 2.2kw The maximumrolling pressure 12TONS Machine size 1600*1500*1600 Weight Weight Following are features of Threaded Rolling Machines: 1, Specialized for metal tubes designing, use triangle support, it can guarantee the work pieces real roundness when by rolling. 2, Fixed Roll/ Pass two applied. 3, Adopt Taiwanese column injection pump and Hydraulic system accessories, electrical. Asphalt can be used long and no heating without cooling system. 4, Use the imported Gimbal, lubrication system used the electric pump, change manual lubricating pump, use the Japanese bearing. 5, Lower noise and durable. 6, Automatic feeding device is optional. 7, rolling shape: rolling thread, textured, ruled, rolling light, cross knurling, roll bars, rolling groove, and roll-off Quality Process Certifications: ISO 9000-2001 Quality guarantee: (1) Factory guarantees machinery well packed and testing qualified before shipment. (2) Factory guarantees all the goods are brand-new; no defects for the specifications or materials used. Twelve months quality warranty after Customer accepts the inspection for machinery’s trial operation. Claims Customer has rights to claims if there is quality problem caused by deficient manufacturing procedure, material or technical parameter, which doesn’t match the contract specified, factory will take responsibility for all related expenses caused. Penalty1, if contractual delivery day postponed due to factory’s reason except force-majeure, Customer has rights to get the compensation by portion from factory based on the followings: (1) factory has ten days grace period (2) Starting from the eleven days after delivery day postponed, every day’s penalty for factory is the whole contract amount’s 0.1%. 2, if contractual payment day postponed due to Part A’s reason except force-majeure, factory has rights to get the compensation by portion from Customer based on the followings: (1) Customer has ten days grace period (2) Starting from the eleven days after payment day postponed, every day’s penalty for Customer is the whole contract amount’s 0.1%. 3, the above mentioned penalty total amount can not be exceeding the whole contract amount’s 5%. Force Majeure: We factory shall not be held responsible for late delivery of the goods owing to generally recognized Force Majerue. Factory should notice Customer by oral immediately. 15 days later after force Majerue happens, and post customer the written proof documents from the related departments. If force manjerue keeps more than 60 days, Customer can cancel the contract. Factory should return the payment. Technical materials provide: Factory should provide the following data Each of Chinese / English version manual and matching tools enclosed for one machine. Contract amendment Any changes for the contract clauses, a written contract amendment must be signed by both parties. Arbitration If there is dispute during contract implementation, we should settle through negotiation made in the principle of fair cooperation. If not, the case under dispute shall be submitted for arbitration. Which has the same equally binding to both Parties, The cost of arbitration shall be borne by the losing party. During the arbitration, the non-dispute portion of the contract continues to implement except the arbitration part.

Delivery terms and packaging

Packaging Detail: Export package Delivery Detail: 15-60days
Port: Shenzhen

Payment term

Letter of credit

Telegraphic transfer

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1

    Дата события:

    12.10.2016 - 18.10.2016
    Catalog
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product